1. |
Foundation |
a. Excavation : Upto hard strata (or)up to 4 max |
b. Foundation : PCC : 1:5:10 mix base using 1½” metal jelly |
||
c. Footing : R.R.Masonry in cm. 1:8 mix |
||
2. |
Basement |
R.R.Masonry in m.1:7 mix basement filled with excavated earth soil. |
3. |
Plinth Beam |
Plinth Beam throughout in 1:2:4 mix with suitable reinforcement |
4. |
Super-Structure |
Brick work in cm 1:6 mix 9” tk, for main wall & partition walls in cm.1:6 mix 4½” tk, using quality chamber bricks. Total wall ht.10’0”. |
5. |
Lintel |
R.C.C.Lintels throughout in 1:2:4 mix with suitable reinforcement. |
6. |
Loft & Sunshades |
1½” tk. concrete provided in 1:2:4 mix with suitable & reinforcement. |
7. |
Roof Slab |
5½” tk. concrete provided in 1:2:4 mix with suitable & necessary reinforcements. |
8. |
Parapet wall and Weathering course |
44½ tk. Brick work in cm.1:6 mix 2’6” ht.weathering course in 12:32 ½ mix of lime and brick bats (Surki) and top finished in cm.1.5 mix to require. |
9. |
Flooring |
C.C.1:5:10 mix using 1 ½” metal jelly and top finished with top quality ceramic tiles wroth Rs. 70 /- and for main door steps finished with granite tile. Portico will be finished with quality Portico tiles worth Rs.40 /- |
10. |
Wall Dadoing |
Wall dadoing finished with Gujarat glass tiles up to 7’40” ht. above kitchen platform wall & 7’0” ht. for toilet walls worth Rs.45 /-. The kitchen platform will be finished with black granite top having 2’x1’6” Stainless Steel Sink or standard length as per standard plan. (Extra Kitchen Table top will be done on extra cost). |
11. |
Electrical |
Three phase concealed wiring – Wire Fybros , Switches - Legrand |
a.Hall |
2 Lighting points, 2 way outer light points, 2 Fan point, 2 plug 5 Amps & provision for T.V. & Telephone cable connection, 1 home theatre point.. |
|
b.Bed |
2 Lighting points, 1 Fan Point & 1 Plug point 15 Amps, 1 exhaust fan point, 1 AC point, 1 TV point, 1 Foot Lamp point . |
|
c.Kitchen |
1 light point, 1 plug point 5 Amps & plug point 15 Amps, 1 exhaust fan point, R.O.Point. |
|
D.Dining |
2 light point, 1 plug point 15 Amps, 1 Fan point . |
|
E.Outer |
2 light points, 1 bell switch point in front side. |
|
12. |
Plumbing & Sanitary Arrangements |
Concealed P.V.C. pipes of approved standard Thickness, size, brand & quality, chromium coated fitting, white latrine basin 3 nos. and washbasin 1 No. wherever required. |
Kitchen |
1 tap for sink - Plato Tap |
|
Toilet |
1 shower with mixer valve for main attached toilet as per Standard plain only. |
|
1 tap for latrine |
||
1 extra tap |
||
Outer |
1 Outer tap |
|
Wash-basin |
1 tap |
|
13. |
Joineries Doors |
Main door frame of Malaysian Sal Wood and all other door frames are Flues Door. Toilet doors are of P.V.C. Doors. |
14. |
Window |
UPVC Windows and UPVC French doors of reputed make. |
15. |
Lock & Fitting |
Front door lock with Brass Handled first quality locks with Brass hinges and Tower, Bolt, Other, that main door all the other doors will have Altrop with powder Coated Iron hinges and powder Coated Aluminium Tower bolt and Handles. |
Compound wall |
Sub-structure with R.R. masonry in cm.1:8 mix and main Structure in hallow Block of suitable wall plastered and color washed A gate of 5’0” ht. The road facing compound wall plastered and color washed. ‘A’ gate of 8’6” (5.0 and 3’6”) will be provided. |
|
16. |
Painting |
External: - Two coats exterior acrylic emulsion paint of Asian or equivalent make over one coat of primer. |
Internal: - Smooth wall patty finish with acrylic emulsion of Asian or equivalent makes over one coat of primer. |